Project: EaglesWing   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Todd Luebstorf   -  
Project:   Zenith CH750SD   -   VIEW REPORTS
Total Hours:496.7
Total Flight Time:
Start/Last Date:Dec 12, 2019 - No Finish Date
Engine:Viking 195
Panel:Dynon
 
Friendly URL: https://eaabuilderslog.org?s=EaglesWing

Home or Last Project Picture

Sep 04, 2021     Elevator Trim Tab - (2.1 hours)       Category: Tail
Decided to use solid AD rivets on the elevator trim tab doublers and horn. Drilled, debured, and assembled the tab with 6 each #5 AD rivets and 3 each #6 AD rivets. Riveted the hinge to the tab with 17 A3 rivets.


 